Search
.Management Sciences
1. bottom face near counterfort
2. top face near counterfort
3. bottom face near centre of span
4. top face near centre of span The correct answer is
A. only (1)
B. only (2)
C. both (1) and (4)
D. both (2)and (3)
Related Mcqs:
- As compared to ordinary portland cement, high alumina cement has______________?
- A. higher initial setting time but lower final setting time B. lower initial setting time but higher final setting time C. higher initial and final setting times D. lower initial and final setting times...
- In case of hand mixing of concrete, the extra cement to be added is__________________?
- A. 5% B. 10% C. 15% D. 20%...
- Ratio of permissible stress in direct compression and bending compression is______________?
- A. less than 1 B. between 1 and 1.5 C. between 1.5 and 2.0 D. greater than 2...
- During erection, the pile of length / is supported by a crane at a distance of________________?
- A. 0.207 / B. 0.293 / C. 0.7071 D. 0.793 / from the driving end of pile which rests on the ground...
- In counterfort type retaining walls_____________?
- 1. the vertical slab is designed as a continuous slab 2. the heel slab is designed as a continuous slab 3. the vertical slab is designed as a cantilever 4. the heel slab is designed as a cantilever The correct answer is? A. (1) and (ii) B. (1) and(4) C. (2) and (3) D. (3) … In counterfort type retaining walls_____________?Read More...
Recent Comments