.Management Sciences
A. Personnel Factor
B. Product Factor
C. Platform Factor
D. Project Factor
Related Mcqs:
- A _______________ is developed using historical cost information that relates some software metric to the project cost ?
- A. Algorithmic cost modelling B. Expert judgement C. Estimation by analogy D. Parkinson’s Law...
- COCOMO was developed initially by _____________________ ?
- A. B.Beizer B. Rajiv Gupta C. B.W.Bohem D. Gregg Rothermal...
- If an Indirect approach is taken, then the sizing approach is represented as_______________?
- A. LOC B. FP C. Fuzzy Logic D. LOC and FP...
- Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?
- A. The difficulty of the problem to be solved B. High frustration caused by personal, business, or technological factors that causes friction among team members C. The degree of sociability required for the project D. The rigidity of the delivery date...
- A sequence of baselines representing different versions of a system is known as ____________________?
- A. System building B. Mainline C. Software Configuration Item(SCI) D. None of the mentioned...
Recent Comments