Commitments to unrealistic time and resource estimates may result in____________________?
A. project delay
B. poor quality work
C. project failure
D. all of the mentioned
A technique for performing quantitative analysis of progress is known as______________________?
A. BCWS
B. EVA
C. BAC
D. CBSE
(more…)
Which model is used during early stages of the system design after the requirements have been established ?
A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model
(more…)
Which of the following option is not tracked by configuration management tools ?
A. Tracking of change proposals
B. Storing versions of system components
C. Tracking the releases of system versions to customers
D. None of the mentioned
(more…)
Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?
A. The difficulty of the problem to be solved
B. High frustration caused by personal, business, or technological factors that causes friction among team members
C. The degree of sociability required for the project
D. The rigidity of the delivery date
(more…)
Which type of software engineering team has a defined leader who coordinates specific tasks and secondary leaders that have responsibility for sub tasks ?
A. Controlled decentralized (CD)
B. Democratic decentralized (DD)
C. Controlled centralized (CC)
D. None of the mentioned
(more…)
Estimation of size for a project is dependent on___________________?
A. Cost
B. Time
C. Schedule
D. None of the mentioned
(more…)