Category: Civil Engineering Mcqs
A closed tank containing water is moving in a horizontal direction along a straight line at a constant speed. The tank also contains a steel ball and a bubble of air. If the tank is decelerated horizontally, then________________?
1. the ball will move to the front
2. the bubble will move to the front
3. the ball will move to the rear
4. the bubble will move to the rear
Find out which of the above statements are correct ?
A. (1) and (2)
B. (1)and(4)
C. (2) and (3)
D. (3) and (4)
Relative density of a compacted dense sand is approximately equal to_____________?
A. 0.4
B. 0.6
C. 0.95
D. 1.20
Assertion A : Lime based mortars give higher ratio of brickwork strength to mortar strength as compared to non-lime mortar. Reason R : Lime based mortars have lower bond strength as compared to non-lime mortars?
Select your answer according to the codes given below.
A. Both A and R are true and R is the correct explanation of A.
B. Both A and R are true but R is not the correct explanation of A.
C. A is true but R is false.
D. A is false but R is true.
The most widely used pump for lifting sewage is_________________?
A. Centrifugal pump
B. Reciprocating pump
C. Pneumatic ejector
D. Air pressure pump
If the over land flow from the critical point to the drain is 8 km and the difference in level is 12.4 m, the inlet time is________________?
A. 2 hours
B. 3 hours
C. 4 hours
D. 5 hours
Pick up the correct statement from the following ?
A. Indian space effort started in 1962 with the establishment of a rocket
B. Development of space (DOS) was established by the Government of India in 1972
C. Indian Space Research Organisation (ISRO) is responsible for the space technology and its application to various activities
D. All of these
Which of the following losses of prestress occurs only in pretensioning and not in post-tensioning ?
A. elastic shortening of concrete
B. shrinkage of concrete
C. creep of concrete
D. loss due to friction
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is__________________?
A. 500 m3
B. 1000 m 3
C. 1500 m3
D. 2000 m3