.Management Sciences
Category: Civil Engineering Mcqs
In actual machines______________?
A. mechanical advantage is greater than velocity ratio
B. mechanical advantage is equal to velocity ratio
C. mechanical advantage is less than velocity ratio
D. mechanical advantage is unity
E. none of the above
1% of voids in a concrete mix would reduce its strength by about______________?
A. 5%
B. 10 %
C. 15%
D. 20%
If P kg/m2 is the upward pressure on the slab of a plain concrete footing whose projection on either side of the wall is a cm, the depth of foundation D is given by________________?
A. D = 0.00775 aP
B. D = 0.0775 aP
C. D = 0.07775 aP
D. D = 0.775 Pa
A close coil helical spring when subjected to a moment M having its axis along the axis of the helix_________________?
A. It is subjected to pure bending
B. Its mean diameter will decrease
C. Its number of coils will increase
D. All the above
In a gusseted base, when the end of the column is machined for complete bearing on the base plate, then the axial load is assumed to be transferred to base plate__________________?
A. fully by direct bearing
B. fully through fastenings
C. 50% by direct bearing and 50% through fastenings
D. 75% by direct bearing and 25% through fastenings
Select the correct statement______________?
A. More the value of group index, less thickness of pavement will be required
B. More the value of CBR, greater thickness of pavement will be required
C. Minimum and maximum values of group index can be 0 and 20 respectively
D. all of the above
When a uniformly distributed load, longer than the span of the girder, moves from left to right, then the maximum bending moment at mid section of span occurs when the uniformly distributed load occupies_______________?
A. less than the left half span
B. whole of left half span
C. more than the left half span
D. whole span
A contractor has two options : Invest his money in project A or (II) : Invest his money in project B. If he decides to invest in A, for every rupee invested, he is assured of doubling his money in ten years. If he decides to invest in B, he is assured of making his money 1.5 times in 5 years. If the contractor values his money at 10% interest rate, he______________?
A. should invest in neither of the two projects
B. could invest in either of the two projects
C. should invest in project A
D. should invest in project B
The measurement is made in square metre in case of_________________?
A. Cement concrete in foundation
B. R.C.C. structure
C. Hollow concrete block wall
D. None of these