Search
.Management Sciences
A. N/(m+l)
B. m/(N+l)
C. m/N
D. (N+l)/m
Related Mcqs:
- If the intensity of rainfall is more than the infiltration capacity of soil, then the infiltration rate will be______________?
- A. equal to rate of rainfall B. equal to infiltration capacity C. more than rate of rainfall D. more than infiltration capacity...
- Which of the following canal structures is used to remove surplus water from an irrigation channel into a natural drain ?
- A. canal fall B. canal outlet C. canal escape D. canal regulator...
- A runoff river plant_________________?
- A. is a medium head scheme B. generates power during peak hours only C. is suitable only on a perennial river D. has no pondage at all...
- The drainage water intercepting the canal can be disposed of by passing the canal below the drainage in___________________?
- A. aqueduct and syphon aqueduct B. aqueduct and super passage C. super passage and canal syphon D. level crossing...
- The amount of irrigation water required to meet the evapotranspiration needs of the crop during its full growth is called________________?
- A. effective rainfall B. consumptive use C. consumptive irrigation requirement D. net irrigation requirement...
Recent Comments