Search
.Management Sciences
A. level crossing
B. no parking
C. end of speed limit
D. overtaking prohibited
Related Mcqs:
- The terrain may be classified as rolling terrain if the cross slope of land is______________?
- A. upto 10% B. between 10% and 25% C. between 25% and 60% D. more than 60%...
- If the design speed is V kmph and deviation angle is N radians, then the total length of a valley curve in meters is given by the expression_________________?
- A. 0.38 N V3/2 B. 0.38 (NV3)”2 C. 3.8 NV”2 D. 3.8 (NV3)”2...
- The maximum number of vehicles beyond which the rotary may not function efficiently is______________?
- A. 500 vehicles per hour B. 500 vehicles per day C. 5000 vehicles per hour D. 5000 vehicles per day...
- Which of the following represents hardest grade of bitumen ?
- A. 30/40 B. 60/70 C. 80/100 D. 100/120...
- For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is________________?
- A. dry rolling, wet rolling, application of screening and application of filler B. dry rolling, application of filler, wet rolling and application of screening C. dry rolling, application of screening, wet rolling and application of filler D. dry rolling, application of screening, application of filler and wet rolling...
Recent Comments