A. Metre for length
B. Cubic metre for area
C. Square metres for volume
D. Litre for capacity
Related Mcqs:
- The main factor to be considered while preparing a detailed estimate, is________________?
- A. Quantity of the materials B. Availability of materials C. Transportation of materials D. All the above...
- The measurement is made in square metre in case of_________________?
- A. Cement concrete in foundation B. R.C.C. structure C. Hollow concrete block wall D. None of these...
- The item of the brick structure measured in sq.m, is___________________?
- A. Reinforced brick work B. Broken glass coping C. Brick edging D. Brick work in arches...
- Pick up the incorrect statement from the following?
- A. Dimensions are measured to the nearest 0.01 m B. Areas are measured to the nearest 0.01 sq.m C. Cubic contents are measured to the nearest 0.1 cum D. Weights are measured to the nearest 0.001 tonnes...
- For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?
- A. 0.90 m3 B. 0.94 m3 C. 0.98 m3 D. 1.00 m3...