Search
.Management Sciences
A. Honey comb brick work
B. Brick flat soling
C. Half brick walls or the partition
D. All the above
Related Mcqs:
- The main factor to be considered while preparing a detailed estimate, is________________?
- A. Quantity of the materials B. Availability of materials C. Transportation of materials D. All the above...
- The measurement is made in square metre in case of_________________?
- A. Cement concrete in foundation B. R.C.C. structure C. Hollow concrete block wall D. None of these...
- The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?
- A. 2.5 sqm B. 5.0 sqm C. 7.5 sqm D. 10 sqm...
- Pick up the incorrect statement from the following?
- A. The built up covered area at the floor level of any storey of a building is called plinth area B. The usable covered area of the rooms of any storey of a building is called carpet area C. The carpet area of a building along with area of its kitchen, pantry, store, lavatory, bath … Pick up the incorrect statement from the following?Read More...
- For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________?
- A. 0.200 m3 B. 0.247 m3 C. 0.274 m3 D. 0.295 m3...
Recent Comments