A. Clearance between shell & baffles and between tube & baffles should be minimum to avoid
by-passing of the fluid, but it should be enough to permit the removal of tube bundle
B. Baffles are supported independently of the tubes by tie rods and positioned by spacers
C. Tie rods are fixed at one end in the tube sheet by making blind holes and the minimum
number of tie rods is 4 with at least 10 mm diameter
D. Bracket supports are used for horizontal shell, while saddle support is used for vertical shell

Leave a Reply

Your email address will not be published. Required fields are marked *