Search
.Management Sciences
A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model
Explanation: It is designed to make estimates of prototype development.
Related Mcqs:
- CLSS stands for_____________________?
- A. conveyor line sorting system B. conveyor line sorting software C. conveyor line sorting speed D. conveyor line sorting specification...
- COCOMO-II was developed at _____________________?
- A. University of Texas B. University of Southern California C. MIT D. IIT-Kanpur...
- If an Indirect approach is taken, then the sizing approach is represented as_______________?
- A. LOC B. FP C. Fuzzy Logic D. LOC and FP...
- Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?
- A. The difficulty of the problem to be solved B. High frustration caused by personal, business, or technological factors that causes friction among team members C. The degree of sociability required for the project D. The rigidity of the delivery date...
- A sequence of baselines representing different versions of a system is known as ____________________?
- A. System building B. Mainline C. Software Configuration Item(SCI) D. None of the mentioned...
Recent Comments