A. D [first area + last area + Even area + 2 odd areas]
B. D/3 [first area + last area + 4 Even area + 2 odd areas]
C. D/3 [first area + last area + 2 Even area + 4 odd areas]
D. D/6 [first area + odd areas]
Related Mcqs:
- The main factor to be considered while preparing a detailed estimate, is________________?
- A. Quantity of the materials B. Availability of materials C. Transportation of materials D. All the above...
- The measurement is made in square metre in case of_________________?
- A. Cement concrete in foundation B. R.C.C. structure C. Hollow concrete block wall D. None of these...
- The item of the brick structure measured in sq.m, is___________________?
- A. Reinforced brick work B. Broken glass coping C. Brick edging D. Brick work in arches...
- Pick up the incorrect statement from the following?
- A. The built up covered area at the floor level of any storey of a building is called plinth area B. The usable covered area of the rooms of any storey of a building is called carpet area C. The carpet area of a building along with area of its kitchen, pantry, store, lavatory, bath … Pick up the incorrect statement from the following?Read More...
- For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________?
- A. 0.200 m3 B. 0.247 m3 C. 0.274 m3 D. 0.295 m3...