A. directly to subgrade
B. through structural action
C. through a set of layers to the subgrade
D. none of the above
Related Mcqs:
- Nagpur road plan formula were prepared by assuming______________?
- A. rectangular or block road pattern B. radial or star and block road pattern C. radial or star and circular road pattern D. radial or star and grid road pattern...
- For design, that length of transition curve should be taken which is_____________?
- A. based on allowable rate of change of centrifugal acceleration B. based on rate of change of super elevation C. higher of (A) and (B) D. smaller of (A) and (B)...
- When the width of kerb parking space and width of street are limited, generally preferred parking system is________________?
- A. parallel parking B. 45° angle parking C. 65° angle parking D. 90° angle parking...
- The recommended grade of tar for grouting purpose is_______________?
- A. RT-1 B. RT-2 C. RT.3 D. RT-5...
- In the penetration macadam construction, the bitumen is__________________?
- A. sprayed after the aggregates are spread and compacted B. premixed with aggregates and then spread C. sprayed before the aggregates are spread and compacted D. none of the above...