A. measurement
B. measure
C. metric
D. all of the mentioned
Explanation: Metric is a quantitative measure of the degree to which a system, component, or process possesses a given attribute.
Related Mcqs:
- Defects removal efficiency (DRE)depends on ______________________?
- A. E – errors found before software delivery B. D – defects found after delivery to user C. Both E and D D. Varies with project...
- Function Point Computation is given by the formula___________________?
- A. FP = [count total * 0.65] + 0.01 * sum(Fi) B. FP = count total * [0.65 + 0.01 * sum(Fi)]. C. FP = count total * [0.65 + 0.01] * sum(Fi) D. FP = [count total * 0.65 + 0.01] * sum(Fi)...
- SMI = [Mt – (Fa + Fc + Fd)]/Mt. Here Mt is the number of modules______________?
- A. in the current release B. in the current release that have been changed C. from the preceding release that were deleted in the current release D. none of the mentioned...
- Which of the following is not categorized under Component-Level Design Metrics ?
- A. Complexity Metrics B. Cohesion Metrics C. Morphology Metrics D. Coupling Metrics...
- Which of the following is not categorized under Product Operation of McCall’s Software Quality Factors ?
- A. Flexibility B. Reliability C. Usability D. Integrity...
Recent Comments