Search
.Management Sciences
A. LOC
B. Halstead’s program length
C. Function Count
D. Cyclomatic Complexity
Explanation: It is the part of white box testing.
Related Mcqs:
- The process each manager follows during the life of a project is known as ___________________?
- A. Project Management B. Manager life cycle C. Project Management Life Cycle D. All of the mentioned...
- Which technique is applicable when other projects in the same analogy application domain have been completed ?
- A. Algorithmic cost modelling B. Expert judgement C. Estimation by analogy D. Parkinson’s Law...
- Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ?
- A. Early design stage model B. Post-architecture-stage model C. Application composition model D. All of the mentioned...
- The expected value for the estimation variable (size), S, can be computed as a weighted average of the optimistic(Sopt), most likely (Sm), and pessimistic (Spess) estimates given as___________________?
- A. EV = (Sopt + 4Sm + Spess)/4 B. EV = (Sopt + 4Sm + Spess)/6 C. EV = (Sopt + 2Sm + Spess)/6 D. EV = (Sopt + 2Sm + Spess)/4...
- Which of the following term is best defined by the statement “The creation of a new codeline from a version in an existing codeline” ?
- A. Branching B. Merging C. Codeline D. Mainline...
Recent Comments