Search
.Management Sciences
A. FP-Based Estimation
B. Process-Based Estimation
C. COCOMO
D. Both FP-Based Estimation and COCOMO
Explanation: Function points and COCOMO are used to evaluate effort.
Related Mcqs:
- A _______________ is developed using historical cost information that relates some software metric to the project cost ?
- A. Algorithmic cost modelling B. Expert judgement C. Estimation by analogy D. Parkinson’s Law...
- Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ?
- A. Early design stage model B. Post-architecture-stage model C. Application composition model D. All of the mentioned...
- The expected value for the estimation variable (size), S, can be computed as a weighted average of the optimistic(Sopt), most likely (Sm), and pessimistic (Spess) estimates given as___________________?
- A. EV = (Sopt + 4Sm + Spess)/4 B. EV = (Sopt + 4Sm + Spess)/6 C. EV = (Sopt + 2Sm + Spess)/6 D. EV = (Sopt + 2Sm + Spess)/4...
- What assess the risk and your plans for risk mitigation and revise these when you learn more about the risk ?
- A. Risk monitoring B. Risk planning C. Risk analysis D. Risk identification...
- A technique for performing quantitative analysis of progress is known as______________________?
- A. BCWS B. EVA C. BAC D. CBSE...