A. Underestimated development time
B. Organizational restructuring
C. Requirements changes
D. None of the mentioned
Explanation: Tracing the requirements can help us understand the risk
Related Mcqs:
- A _______________ is developed using historical cost information that relates some software metric to the project cost ?
- A. Algorithmic cost modelling B. Expert judgement C. Estimation by analogy D. Parkinson’s Law...
- Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
- A. Early design stage model B. Post-architecture-stage model C. Application composition model D. All of the mentioned...
- A software ______________ provides the framework from which a comprehensive plan for software development can be established?
- A. people B. product C. process D. none of the mentioned...
- Which method recommends that very frequent system builds should be carried out with automated testing to discover software problems ?
- A. Agile method B. Parallel compilation method C. Large systems method D. All of the mentioned...
- Which of the following is not an adaptation criteria for software projects ?
- A. Size of the project B. Customers Complaints C. Project staff D. Mission criticality...
Recent Comments