.Management Sciences
A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model
Related Mcqs:
- Which of the following is not an option to achieve reliable cost and effort estimate ?
- A. Base estimates on similar projects that have already been completed B. Use one or more empirical models for software cost and effort estimation C. Use relatively simple decomposition techniques to generate project cost and effort estimates D. The ability to translate the size estimate into human effort, calendar time, and dollars...
- Which one is not a risk management activity ?
- A. Risk assessment B. Risk generation C. Risk control D. None of the mentioned...
- Which of the following risks are derived from the software or hardware technologies that are used to develop the system ?
- A. Managerial risks B. Technology risks C. Estimation risks D. Organizational risks...
- Commitments to unrealistic time and resource estimates may result in____________________?
- A. project delay B. poor quality work C. project failure D. all of the mentioned...
- What evaluates the risk associated with the technology to be implemented as part of project scope ?
- A. Concept scoping B. Preliminary concept planning C. Technology risk assessment D. Customer reaction to the concept...