A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model
Explanation: Estimates are based on function points, which are then converted to number of lines of source code. The formula follows the standard form discussed above with a simplified set of seven multipliers.
Related Mcqs:
- Which of the following is an important factor that can affect the accuracy and efficacy of estimates ?
- A. Project size B. Planning process C. Project complexity D. Degree of structural uncertainty...
- What threatens the viability of the software to be built ?
- A. Known risks B. Business risks C. Project risks D. Technical risks...
- A software ______________ provides the framework from which a comprehensive plan for software development can be established?
- A. people B. product C. process D. none of the mentioned...
- Which of the following is a collection of component versions that make up a system ?
- A. Version B. Codeline C. Baseline D. None of the mentioned...
- Which of the following is a project scheduling method that can be applied to software development ?
- A. PERT B. CPM C. CMM D. Both PERT and CPM...
Recent Comments