Search
.Management Sciences
A. Software configuration audit
B. Software configuration management
C. Baseline
D. None of the mentioned
Related Mcqs:
- CLSS stands for_____________________?
- A. conveyor line sorting system B. conveyor line sorting software C. conveyor line sorting speed D. conveyor line sorting specification...
- Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
- A. Early design stage model B. Post-architecture-stage model C. Application composition model D. All of the mentioned...
- Which paradigm relies on the natural compartmentalization of a problem and organizes team members to work on pieces of the problem with little active communication among themselves ?
- A. random paradigm B. open paradigm C. closed paradigm D. synchronous paradigm...
- Commitments to unrealistic time and resource estimates may result in____________________?
- A. project delay B. poor quality work C. project failure D. all of the mentioned...
- Which of the following is not a Software Configuration Management Activity ?
- A. Configuration item identification B. Risk management C. Release management D. Branch management...
Recent Comments