.Management Sciences
A. normal
B. binomial
C. beta
D. exponential
E. Gaussian
Related Mcqs:
- The term ‘value’ in value engineering refers to_______________?
- A. total cost of the product B. selling price of the product C. utility of the product D. manufactured cost of the product E. depreciation value...
- PERT has following time estimate_________________?
- A. one time estimate B. two time estimate C. three time estimate D. four time estimate E. nil time estimate...
- Gnatt chart provides information about the________________?
- A. material handling B. proper utilisation of manpower C. production schedule D. efficient working of machine E. all of the above...
- Work study is concerned with_________________?
- A. improving present method and finding standard time B. motivation of workers C. improving production capability D. improving production planning and control E. all of the above...
- The time which results in the least possible direct cost of an activity is known as________________?
- A. normal time B. slow time C. crash time D. standard time E. none of the above...