A. programmer evaluation and review technique is event oriented
B. programmer evaluation and review technique is not event oriented
C. critical path method is event oriented
D. critical.path method is not activity oriented
E. none of the above
Related Mcqs:
- One time measurement unit (TMU) in method time measurement system equals______________?
- A. 0.0001 minute B. 0.0006 minute C. 0.006 minute D. 0.001 minute E. 0.06 minute...
- Inventory management consists of__________________?
- A. effective running of stores B. state of merchandise methods of stroing and maintenance etc C. stock control system D. all of the above E. none of the above...
- The objective of time study is to determine the time required to complete a job by_______________?
- A. fast worker B. average worker C. slow worker D. new entrant E. any one of the above...
- The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as_________________?
- A. Rowan Plan B. Bedaux Plan C. Taylor Differential Piece rate system D. Halsey Premium plan E. Day work plan...
- Pick up the incorrect statement from the following?
- A. an activity of the project is denoted by an arrow on the net work B. the tail of the arrow indicates the start of the activity C. the head of the arrow indicates the end of,the activity! D. the arrows are drawn (to scale from) left to right E. each activity consumes a given … Pick up the incorrect statement from the following?Read More...
Recent Comments