Search
.Management Sciences
A. critical path method is an improvement upon bar chart method
B. critical path method provides a realistic approach to the daily problems
C. critical path method avoids delays which are very common in bar chart
D. critical path method was invented by Morgan R. Walker of Dupot and James E. Kelley of Remington U.S.A in 1957
E. all of the above
Related Mcqs:
- Basic tool in work study is __________________?
- A. graph paper B. process chart C. planning chart D. stop watch E. analytical mind...
- Templates are used for_________________?
- A. a planning layout B. flow of material C. advancing a programme in automatic machines D. copying complicated profiles E. none of the above...
- CPM has following time estimate__________________
- A. one time estimate B. two time estimate C. three time estimate D. four time estimate E. nil time estimate...
- Work study is concerned with_________________?
- A. improving present method and finding standard time B. motivation of workers C. improving production capability D. improving production planning and control E. all of the above...
- The critical activity has____________________?
- A. maximum float B. minimum float C. zero float, D. average float E. none of these...
Recent Comments