Search
.Management Sciences
A. free float = total float
B. independent float = total float
C. independent float > free float
D. free float > total float
E. independent float < free float
Related Mcqs:
- One time measurement unit (TMU) in method time measurement system equals______________?
- A. 0.0001 minute B. 0.0006 minute C. 0.006 minute D. 0.001 minute E. 0.06 minute...
- Inventory management consists of__________________?
- A. effective running of stores B. state of merchandise methods of stroing and maintenance etc C. stock control system D. all of the above E. none of the above...
- The objective of time study is to determine the time required to complete a job by_______________?
- A. fast worker B. average worker C. slow worker D. new entrant E. any one of the above...
- In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches__________________?
- A. 50% B. 661% C. 75% D. 80% E. 90%...
- Pick up the correct statement from the following?
- A. programmer evaluation and review technique is event oriented B. programmer evaluation and review technique is not event oriented C. critical path method is event oriented D. critical.path method is not activity oriented E. none of the above...
Recent Comments