Search
.Management Sciences
A. enlarged view of motion study
B. analysis of one stage of motion study
C. minute and detailed motion study
D. subdivision of an operation into therbligs and their analysis
E. motion study of small components upto mirco-seconds
Related Mcqs:
- Standard time as compared to normal time is_______________?
- A. greater B. smaller C. equal D. there is no such correlation E. none of the above...
- In inventory control, the economic order quantity is the_________________?
- A. optimum lot size B. highest level of inventory C. lot corresponding to break-even point D. capability of a plant to produce E. none of the above...
- In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches__________________?
- A. 50% B. 661% C. 75% D. 80% E. 90%...
- The important file in making a PERT is__________________?
- A. an event can’t be accomplished until activities leading to it are completed B. no activity from any event can be started from preceding event till it is completed C. length of arrow has nothing to do with time D. every activity must be completed before end point is reached E. all of the above...
- According to Rowan plan, if H = hourly rate, A = actual time and S = standard time, then wages will be___________________?
- A. HA B. HA + (S~A) HA C. HA + ^^-H D. HA + ^^-H E. HA + ^^-HA...
Recent Comments