A. overhead crane
B. trolley
C. belt conveyor
D. all of the above
E. none of the above
Related Mcqs:
- Routing prescribes the_________________?
- A. flow of material in the plant B. proper utilization of man power C. proper utilization of machines D. inspection of final product E. none of the above...
- In the Halsey 50-50 plan, the following are rewarded more___________________?
- A. past good workers B. past poor workers C. past average workers D. all of the above E. none of the above...
- Work sampling observations are taken on the basis of_______________?
- A. detailed calculations B. convenience C. table of random numbers D. past experience E. fixed percentage of daily production...
- Emergency rush order can be pushed more effectively in__________________?
- A. job production B. automatic production C. continuous production D. intermittent production E. none of the above...
- The critical path of a network represents_______________________?
- A. the minimum time required for completion of project B. the maximum time required for completion of project C. maximum cost required for completion of project D. minimum cost required for completion of project E. none of the above...
Recent Comments