.Management Sciences
A. a symbol
B. an event
C. an activity
D. micro motions
E. standard symbol and colour
Related Mcqs:
- Work study is done with the help of_______________?
- A. process chart B. material handling C. stop watch D. all of the above E. none of the above...
- Standard time as compared to normal time is_______________?
- A. greater B. smaller C. equal D. there is no such correlation E. none of the above...
- CPM has following time estimate__________________
- A. one time estimate B. two time estimate C. three time estimate D. four time estimate E. nil time estimate...
- The most important objective behind plant layout is_____________________?
- A. overall simplification, safety of integration B. economy in space C. maximum travel time in plant D. to provide conveniently located shops E. to avoid any bottlenecks...
- If TL is the largest allowable event occurrence time, total activity slack (s) is equal to__________________?
- A. latest start time – earliest start time B. latest finish time – earliest finish time (EFT) C. TL-EFT D. all of the above E. none of the above...
Recent Comments