.Management Sciences
A. operator’s activity
B. flow of material and in case of trouble locate source of trouble
C. minimising the delays
D. making efficient despatching
E. none of the above
Related Mcqs:
- Per cent idle time for men or machines is found by___________________?
- A. work sampling B. time study C. method study D. work study E. ABC analysis...
- Current assets include_______________?
- A. manufacturing plant B. manufacturing plant and equipment C. inventories D. common stock held by the firm E. all of the above...
- For ship vessel industry the following layout is best suited_________________?
- A. process layout B. product layout C. fixed position layout D. plant layout E. functional layout...
- Choose the wrong statement Time study is used to_________________?
- A. determine overhead expenses B. provide a basis for setting piece prices or incentive wages C. determine standard costs D. determine the capability of an operator to handle the number of machines E. compare alternative methods...
- Pessimistic time is___________________?
- A. the maximum time which an activity might require B. the average time required for a job C. the most probable time considering all conditions D. the minimum time in which an activity can possibly be accomplished E. the earliest finish...
Recent Comments