Search
.Management Sciences
A. latest start time of succeeding event -earliest finish time of preceding event activity time
B. latest start time of the event – earliest start time of the event
C. latest finish time of event – earliest finish time of the event
D. anyone of the above
E. none of the above
Related Mcqs:
- Per cent idle time for men or machines is found by___________________?
- A. work sampling B. time study C. method study D. work study E. ABC analysis...
- In the Halsey system of wage incentive plan, a worker is ________________?
- A. paid as per efficiency B. ensured of minimum wages C. not paid any bonus till his efficiency D. never a loser E. induced to do more work...
- Gnatt chart provides information about the________________?
- A. material handling B. proper utilisation of manpower C. production schedule D. efficient working of machine E. all of the above...
- The performance of a specific task in CPM is known as ______________________?
- A. dummy B. event C. activity D. contract E. none of the above...
- Routing assists engineers in deciding in advance___________________?
- A. the flow of material in the plant B. the methods of proper utilization of manpower C. the methods of proper utilization of machines D. the layout of factory facilities E. normal route of workers through the plant...
Recent Comments