Search
.Management Sciences
Category: Software Engineering Mcqs
Project Management ensures that______________?
A. project’s risk is assessed
B. project’s feasibility is assessed
C. system is developed at minimum cost
D. both A and B
What package group will you select during the custom configuration to enable the machine to communicate with Windows clients ?
A. SMB (Samba) Connectivity
B. IPX/NetWare Connectivity
C. Dial-up Workstation
D. All of the above
Objects are executed _____________________?
A. sequentially
B. in Parallel
C. sequentially & Parallel
D. none of the mentioned
(more…)
Which driver is called as thin-driver in JDBC ?
A. Type-1 driver
B. Type-2 driver
C. Type-3 driver
D. Type-4 driver
In ASP.NET if one uses Windows authentication the current request attaches an object called as_______________?
A. WindowsPrincipal
B. WindowDatset
C. Serialization
D. None of the Above
Which of the following commands is used to copy a file wb from the programs directory into a file called wbx in the misc directory ?
A. copy programs/wb misc/wbx
B. cp programs/wb misc/wbx
C. tar programs/wb misc/wbx
D. copy a:programs/wb b:misc/wbx
What incorporates data, architectural, interface, and procedural representations of the software ?
A. design model
B. user’s model
C. mental image
D. system image
(more…)
Which is not a typical business function ?
A. Sales
B. Service
C. Manufacturing
D. Benefits and Compensation
Which of the following is not included in the certification approach ?
A. Creation of usage scenarios
B. Specific usage file
C. Generation of test cases from the servers end.
D. Reliability
(more…)
Recent Comments