Search
.Management Sciences
Category: Workshop Technology
Tandem drawing of wires and tubes is necessary because_________________?
A. accuracy in dimensions is not possible otherwise
B. surface finish improves after every drawing stage
C. it is not possible to reduce at one stage
D. annealing is needed between stages
A neutral flame is obtained by supplying___________________?
A. more volume of acetylene and less volume of oxygen
B. equal volumes of oxygen and acetylene
C. more volume of oxygen and less volume of acetylene
D. none of the above
In a _____________ , both cutting and non-cutting operations are performed at one station of the press in every stroke of the ram?
A. progressive die
B. simple die
C. compound die
D. combination die
Lancing is the operation of _________________?
A. cutting a sheet of metal through part of its length and then bending the cut portion
B. removal of metal to the desired shape from the edge of a plate
C. cutting a sheet of metal in a straight line along the length
D. bending a sheet of metal along a curved axis
In spot welding, the spacing between two spot weld should not be less than _______________?
A. d
B. 1.5d
C. 3d
D. 6d
The shrinkage allowance for cast iron pattern is________________?
A. 15 mm/m
B. 20 mm/m
C. 26 mm/m
D. 10 mm/m
The operation of straightening a curved sheet metal, is known as____________________?
A. squeezing
B. coining
C. planishing
D. drawing
The cold working of metals is carried out_________________?
A. below the recrystallisation temperature
B. at the recrystallisation temperature
C. at any temperature
D. above the recrystallisation temperature
Which of the following statement is wrong ?
A. The mortise gauge has two scribing pins
B. The gouges are chisels with a hollow shaped blade
C. An auger is a planning tool
D. all of these
A file removes the metal during___________________?
A. both forward and return strokes
B. forward stroke
C. return stroke
D. none of these
Recent Comments