In which of the following layouts, the lines need to the balanced_______________?
A. process layout
B. product layout
C. fixed position layout
D. plant layout
E. functional layout
Basic tool in work study is __________________?
A. graph paper
B. process chart
C. planning chart
D. stop watch
E. analytical mind
‘Value’ for value engineering and analysis purposes is defined as_____________________?
A. purchase value
B. saleable value
C. depreciated value
D. present worth
E. function/cost
Process layout is employed for_________________?
A. batch production
B. continuous type of product
C. effective utilisation of machines
D. all of the above
E. none of the above
The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store_______________?
A. inflated system
B. primary cost method
C. current value method
D. fixed price method
E. variable price method
The linear programming techniques can be applied successfully to industries like_________________?
A. iron and steel
B. food processing
C. oil and chemical
D. banking
E. all of the above
PERT stands for k (fit) project evaluation and review technique__________________?
A. project examination and review technique
B. project evaluation and reporting technique
C. process execution and reporting technology
D. project execution and results technique
Material handling in automobile industry is done by_________________?
A. overhead crane
B. trolley
C. belt conveyor
D. all of the above
E. none of the above
Pick up the correct step used for scheduling a project by C.P.M.__________________?
A. a project is divided into various activities
B. required time for each activity is established
C. sequence of various activities is made according to their importance
D. network is drawn by connecting the activities and the events
E. all of the above
If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start and finish times, then the following relation holds good______________________?
A. EF=ES+D
B. LS=LF-D
C. LF = LS + D
D. D = EF-ES
E. all of the above