Acceptance sampling is widely used in________________?
A. batch production
B. job production
C. mass production
D. all of the above
E. none of the above
Work study is done with the help of_______________?
A. process chart
B. material handling
C. stop watch
D. all of the above
E. none of the above
Gnatt chart provides information about the________________?
A. material handling
B. proper utilisation of manpower
C. production schedule
D. efficient working of machine
E. all of the above
Value engineering aims at finding out the________________?
A. depreciation value of a product
B. resale value of a product
C. major function of the item and accomplishing the same at least cost without change in quality
D. break even point when machine re-quires change
E. selling price of an item
Father of time study was_________________?
A. F.W. Taylor
B. H.L. Gantt
C. F.B. Gilberfh
D. R.M. Barnes
E. H.B. Maynord
Which one of the following represents a group incentive plan ?
A. Scanlon Plan
B. Rowan Plan
C. Bedaux Plan
D. Taylor Differential Piece Rate System
E. Halsey Premium Plan
Monte Carlo solutions in queuing theory are extremely useful in queuing problems_________________?
A. that can’t be analysed mathematically
B. involving multistage queuing
C. to verify mathematical results
D. all of the above
E. none of the above
If TL is the largest allowable event occurrence time, total activity slack (s) is equal to__________________?
A. latest start time – earliest start time
B. latest finish time – earliest finish time (EFT)
C. TL-EFT
D. all of the above
E. none of the above
The difference between the time available to do the job and the time required to do the job, is known as_________________?
A. event
B. float
C. duration
D. constraint
E. none of the above
Templates are used for_________________?
A. a planning layout
B. flow of material
C. advancing a programme in automatic machines
D. copying complicated profiles
E. none of the above