Pessimistic time is___________________?
A. the maximum time which an activity might require
B. the average time required for a job
C. the most probable time considering all conditions
D. the minimum time in which an activity can possibly be accomplished
E. the earliest finish
In perpetual inventory control, the material is checked as it reaches its__________________?
A. minimum value
B. maximum value
C. average value
D. middle value
E. alarming value
The time of completing a project in network analysis is given by following time of the critical activity meeting at the finalitiode_________________?
A. early finish
B. early start
C. late start
D. late finish
E. none of the above
The technique for establishing and maintaining priorities among the various jobs of any project is known as___________________?
A. event flow scheduling technique
B. critical ratio scheduling
C. slotting technique for scheduling
D. short interval scheduling
E. none of the above
The allowed time for a job equals standard time plus___________________?
A. policy allowance
B. interference allowance
C. process allowance
D. learning allowance
E. unforeseen allowance
An optimum project schedule implies_______________?
A. optimum utilization of men, machines and materials
B. lowest possible cost and shortest possible time for project
C. timely execution of project
D. to produce best results under given constraints
E. realistic execution time, minimum cost and maximum profits
Standard time is defined as ____________________?
A. normal time + allowances
B. normal time + idle time + allowances
C. normal time + idle time
D. only normal time for an operation
E. none of the above
The performance of a specific task in CPM is known as ______________________?
A. dummy
B. event
C. activity
D. contract
E. none of the above
In Halsey 50-50 plan, output standards are established______________?
A. by time study
B. from previous production records
C. from one’s judgement
D. all of the above
E. none of the above
A milestone chart_______________________?
A. shows the inter dependences of various jobs
B. depicts the delay of jobs, if any
C. points outgoing ahead of schedule of jobs, if any
D. all of the above
E. none of the above