At the junction of sewers___________________?
0
A. Top of smaller sewer is kept lower
B. Top of larger sewer is kept lower
C. Tops of both the sewers are at the same level
D. None of these
An inverted siphon is designed generally for____________________?
A. One pipe
B. Two pipes
C. Three pipes
D. Four pipes
The maximum diameter of sewers adopted in the designs is_______________?
A. 1.0 m
B. 2.0 m
C. 3.0 m
D. 4.0 m
In sewage having fully oxidised organic matter, the nitrogen exists in the form of________________?
A. Nitrites
B. Nitrates
C. Free ammonia
D. Aluminoid nitrogen
The amount of oxygen consumed by the aerobic bacterias which cause the aerobic biological decomposition of sewage, is known_________________?
A. Bio-Chemical Oxygen Demand (B.O.D.)
B. Dissolved Oxygen (D.O.)
C. Chemical Oxygen Demand (C.O.D.)
D. None of these
The most efficient cross section of sewers in a separate sewerage system is__________________?
A. Parabolic
B. Circular
C. Rectangular
D. New egged
Primary treatment of sewage consists of removal of__________________?
A. Large suspended organic solids
B. Oil and grease
C. Sand and girt
D. Floating materials
The discharge per unit plan area of a sedimentation tank, is generally called________________?
A. Over flow rate
B. Surface loading
C. Over flow velocity
D. All the above
The water carried sewerage system removes__________________?
A. Domestic sewage
B. Industrial sewage
C. Storm sewage
D. All the above