Search
.Management Sciences
Category: Waste Water Engineering
The arrangement made for passing the sewer line below an obstruction below the hydraulic gradient lines called ____________________?
0
A. Inverted syphon
B. Depressed sewer
C. Sag pipe
D. all of these
Pick up the correct statement from the following ?
A. Turbidity is more in strong sewage
B. The black colour indicates septic sewage
C. The sewage omits offensive odours after four hours
D. All the above
In a sludge digestion tank if the moisture content of sludge V1 litres is reduced from p1 % to p2 % the volume V2 is____________________?
A. [(100 + P1)/(100 – P2)] V1
B. [(100 – P1)/(100 + P2)] V1
C. [(100 – P1)/(100 – P2)] V1
D. [(100 + P2)/(100 – P1)] V1
For a continuous flow type of sedimentation tanks__________________?
A. Width of the tank is normally kept about 6 m
B. Length of the tank is normally kept 4 to 5 times the width
C. Maximum horizontal flow velocity is limited to 0.3 m/minute
D. All the above
If the discharge of a sewer running half is 628 1.p.s., i = 0.001, and n = 0.010, the diameter of the sewer, is__________________?
A. 1.39 m
B. 1.49 m
C. 1.59 m
D. 1.69 m
In a residential colony, sewers of diameters 100 mm, 150 mm and 225 mm were laid with a gradient 1 in 120. Which portion of the sewage system does not choke in due course of time?
A. 100 mm dia.
B. 150 mm dia.
C. 225 mm dia.
D. All of these
Recent Comments