Category: Waste Water Engineering
The laying of sewers is done with____________________?
A. Magnetic compass
B. Theodolite
C. Level
D. Clinometer
Pick up the correct statement from the following ?
A. The larger the sewer in size, more will be velocity
B. The smaller the sewer in size, less will be velocity
C. The larger the sewer in size, no deposition will take place
D. The larger the sewer in size, deposition will take place
If D.O. concentration falls down to zero in any natural drainage, it indicates the zone of__________________?
A. Degradation
B. Active decomposition
C. Recovery
D. Cleaner water
Pick up the correct statement from the following?
A. The circular section of sewers provides maximum hydraulic mean depth
B. The circular sewers are provided for separate sewerage system
C. The circular sewers work efficiently if the sections run at least half full
D. All the above
The sludge does not contain waste water from_________________?
A. Bath rooms
B. Wash basins
C. Kitchen sinks
D. Toilets
Pick up the correct statement from the following?
A. The water supply pipes carry pure water free from solid particles
B. The water supply pipes get clogged if flow velocity is less than self cleansing velocity
C. The sewers may be carried up and down the hills and valleys
D. The sewer pipes are generally laid along level hills
‘Cowl’ is provided at___________________?
A. Lower end of ventilating column
B. Upper end of ventilating column
C. Upper end of the manhole
D. First step in manhole
A nuisance is experienced in diluting water if dilution factor is less than_________________?
A. 100
B. 60
C. 40
D. 20
The first stage of neutral process of sludge digestion, is__________________?
A. Acid fermentation
B. Acid regressio
C. Alkaline fermentation
D. None of these