Search
.Management Sciences
Category: Environmental Engineering
For satisfactory working of a sludge digestion unit, the pH range of digested sludge should be maintained as___________________?
A. 4.5 to 6.0
B. 6.5 to 8.0
C. 8.5 to 10.0
D. 10.5 to 12.0
The main disadvantage of cement concrete sewers is________________?
A. less strength
B. difficulty in construction
C. difficulty in transportation due to heavy weight
D. less life
The devices which are installed for drawing water from the sources are called______________?
A. aquifers
B. aquiclude
C. filters
D. intakes
The detention period for oxidation ponds is usually kept as______________?
A. 4-8 hours
B. 24 hours
C. 10 to 15 days
D. 3 months
Cleaning is done by________________?
1) scraping and removal in filters slow sand
2) back washing in slow sand filters
3) scraping and removal in filters rapid sand
4) back washing in rapid sand filters
The correct answer is
A. (1) and (2)
B. (2) and (3)
C. (1) and (4)
D. (2) and (4)
Which of the following chemical compounds can be used for dechlorination of water ?
A. carbon dioxide
B. bleaching powder
C. sulphur dioxide
D. chloramines
The method of analysis of distribution system in which the domestic supply is neglected and fire demand is considered is________________?
A. circle method
B. equivalent pipe method
C. electrical analysis method
D. Hardy cross method
The effect of increasing diameter of sewer on the self cleansing velocity is_____________?
A. to decrease it
B. to increase it
C. fluctuating
D. nil
When there is no recirculation of sewage, then recirculation factor is_______________?
A. 0
B. 1
C. infinity
D. none of the above
Recent Comments