Category: Dock and Harbor Engineering
Select the incorrect statement ?
A. The progress of work in low level method of mound construction is very slow.
B. Barge method of mound construction is economical.
C. In low level method of mound construction, the area of working is limited.
D. In staging method of mound cons-truction, the work is not interrupted even during stormy weather
Assertion A : Intervention of undulations in the sea bed reduces the depth of wave at the section. Reason R : No wave can have a height greater than the depth of water through which it passes?
Select your answer based on the coding system given below?
A. Both A and R are true and R is correct explanation of A.
B. Both A and R are true but R is not the correct explanation of A.
C. A is true but R is false.
D. A is false but R is true
Dead weight tonnage of a ship_______________?
i) varies with latitude and season
ii) is more than displacement tonnage
iii) is the difference between displacement load and displacement light
select the correct statemens.
A. i) and ii) are correct
B. ii) and iii) are correct
C. i) and iii) are correct
D. Only iii) is correct
Which of the following type of sea walls results in greatest protection of shore structures?
A. vertical sea wall
B. sea wall with batter
C. stepped sea wall
D. sea wall with concave face
In basins subjected to strong winds and tide, the length of the berthing area should not be less than____________________?
A. the length of design vessel
B. the length of design vessel + 10% clearance between adjacent vessels
C. the length of design vessel + 20% clearance between adjacent vessels
D. twice the length of design vessel