A. 20 to 40 tonnes/hr
B. 50 to 100 tonnes/hr
C. 100 to 150 tonnes/hr
D. 150 to 200 tonnes/hr
Related Mcqs:
- The main source of production of biogas is__________________?
- A. human waste B. wet cow dung C. wet livestock waste D. all above...
- In a regenerative feed heating cycle, the optimum value of the fraction of steam extracted for feed heating________________?
- A. decreases with increase in Rankine cycle efficiency B. increases with increase in Rankine cycle efficiency C. is unaffected by increase in Rankine cycle efficiency D. none of the above...
- The pressure at the furnace is minimum in case of___________?
- A. forced draught system B. induced draught system C. balanced draught system D. natural draught system...
- For the safety of a steam boiler the number of safety valves fitted are____________?
- A. four B. three C. two D. one...
- Load factor of a power station is defined as____________?
- A. maximum demand/average load B. average load x maximum demand C. average load/maximum demand D. none of the above...