Search
.Management Sciences
A. delay time
B. rise time
C. spread time
D. all
Related Mcqs:
- Leakage current flows through the thyristor in_________?
- A. forward blocking mode B. reverse blocking mode C. both forward and reverse blocking mode D. forward conduction mode...
- 60 thyrsistors are connected in series and parallel to form a 10 KV and 5.5 KA switch. Each thyristor is rated for 1.2 KV, 1 KA. The no. of parallel path are 6. The efficiency of the switch is______________________?
- A. 76.3 % B. 91.6 % C. 83.3 % D. 90.9 %...
- In the operation and control of both naturally commutated and forced commutated SCR base converter, commutation plays an important role. The converters is / are ___________?
- A. AC – DC B. DC – DC C. DC – AC D. All of these...
- In the SPWM, the modulating signal is___________?
- A. Square B. Sinusoidal C. Triangular D. Saw – tooth...
- AC power in a load can be controlled by using_____________?
- A. two SCR’s in parallel opposition B. two SCR’s in series C. three SCR’s in series D. four SCR’s in series...
Recent Comments