Search
.Management Sciences
A. operating schedule of generating units
B. sizes of generating units
C. total installed capacity of the plant
D. all of the above
Related Mcqs:
- A power transformer is usually rated in____________?
- A. kW B. kVAR C. kWh D. kVA...
- Which of the following is the disadvantage due to low power factor?
- A. Poor voltage regulation B. Increased transmission losses C. High cost of equipment for a given load D. All of the above...
- During load shedding:
- A. system power factor is changed B. some loads are switched off C. system voltage is reduced D. system frequency is reduced Efficiency is the secondary consideration in...
- Generating capacity connected to the bus bars and ready to take load when switched on is known as____________?
- A. firm power B. cold reserve C. hot reserve D. spinning reserve...
- In an interconnected system, the diversity factor of the whole system:
- A. remains unchanged B. decreases C. increases D. none of the above...
Recent Comments