Search
.Management Sciences
A. Total budget for the project
B. Time phased budget for the project
C. Total budget for the project including the contingency budget
D. Total budget for the project including the contingency budget and the management reserve
Related Mcqs:
- Quality control is aimed at__________?
- A. Maintaining the desired quality B. Exceeding the desired quality C. Continuously improving the quality D. Following the quality...
- Which of these is correct with respect to a product developed or a service performed?
- A. Bad quality is acceptable, but bad grade is not. B. Bad grade is acceptable, but bad quality is not. C. Neither bad grade nor quality is acceptable. D. Grade and quality is the same thing....
- Engineering ethics refers to_______________?
- A. The rules and standards given by an institution for Engineering practice B. The rules and regulation relating to obligations and rights of others C. The professional regulation D. The rules and standards which govern the conduct of Engineers as professional Engineers...
- As per PEC Code of Conduct a member shall report unethical professional practices of an engineer or a member with substantiating data to____________?
- A. Court of Law B. Concerned Department C. Pakistan Engineering Council D. Law enforcing Agency...
- While designing a project by an engineer, ______________should be taken into account to protect cultural heritage?
- A. All possible alternates B. No protection C. Minimum protection D. No care...
Recent Comments