Search
.Management Sciences
A. Comminutor
B. Shredder
C. Both A. and B.
D. Neither A. nor B.
Related Mcqs:
- ¾th or ¼th extra space is left in sewer pipes at maximum discharge for_________________?
- A. Low estimates of the average and maximum flows B. Large scale infiltration of storm water C. Unexpected increase in population D. All the above...
- Cement concrete sewers are only suitable if non-scouring velocity is between_________________?
- A. 2.5 to 3.0 m/sec B. 3.0 to 4.0 m/sec C. 3.5 to 4.5 m/sec D. 4.5 to 5.5 m/sec...
- The design period of sewage treatment works in normally_________________?
- A. 5 – 10 years B. 15 – 20 years C. 30 – 40 years D. 40 – 50 years...
- For detecting the nitrites in the sewage, the matching colour may be developed by adding_________________?
- A. Potassium permanganate B. Sulphuric acid and napthamine C. Phenol-di -sulphuric acid potassium hydroxide D. None of these...
- Assertion A.: A free board of 0.3 m is provided above the top sewage line in septic tanks. Reason (R): It helps to accommodate the scum in the septic tank_________________?
- A. Both A and R is true and R is the correct explanation of A B. Both A and R is true but R is not a correct explanation of A C. A is true but R is false D. A is false but R is true...
Recent Comments