Search
.Management Sciences
A. 25,000 to 35,000 litres/sqm/day
B. 40,000 to 50,000 litres/sqm/day
C. 50,000 to 60,000 litres/sqm/day
D. 80,000 to 100,000 litres/sqm/day
Related Mcqs:
- For treating the sewage of a large city, you will recommend_________________?
- A. A sedimentation tank and an activated sludge treatment plant B. A plant consisting of Imhoff tanks with low rate trickling filters C. Sedimentation tanks with high rate trickling filters D. None of these...
- The ratio of maximum sewage flow to average sewage flow for mains up to 1 m in diameter, is___________________?
- A. 1.5 B. 2.0 C. 3.0 D. 4.0...
- The design period of sewage treatment works in normally_________________?
- A. 5 – 10 years B. 15 – 20 years C. 30 – 40 years D. 40 – 50 years...
- The laying of sewers is done with____________________?
- A. Magnetic compass B. Theodolite C. Level D. Clinometer...
- The clarigesters are_________________?
- A. Circular septic tanks B. Rectangular septic tanks C. Circular Imhoff double tanks with bottom hoppers D. Circular Imhoff double storey tanks without bottom hoppers...
Recent Comments