A. 1.39 m
B. 1.49 m
C. 1.59 m
D. 1.69 m
Related Mcqs:
- Pick up the correct statement from the following ?
- A. The sewer pipes of sizes less than 0.4 m diameter are designed as running full at maximum discharge B. The sewer pipes of sizes greater than 0.4 m diameter are designed as running 2/3rd or 3/4th full at maximum discharge C. The minimum design velocity of sewer pipes is taken as 0.8 m/sec D. … Pick up the correct statement from the following ?Read More...
- If the length of overland flow from the critical point to the mouth of drain is 13.58 km and difference in level between the critical point and drain mouth is 10 m, the inlet time is___________________?
- A. 2 hours B. 4 hours C. 6 hours D. 8 hours...
- The density of population over 40 hectares is 250/hectare. If water supply demand per day is 200 litres and sewage discharge is 80% of water supply, the sewage flow in sewers of separate system, is_____________________?
- A. 0.05552 cumec B. 0.05554 cumec C. 0.05556 cumec D. 0.0556 cumec...
- Ventilating shafts are provided to a sewer line at every__________________?
- A. 100 m B. 150 m C. 200 m D. 300 m...
- If the grit in grit chambers is 4.5 million litres per day, its cleaning is done____________________?
- A. Manually B. Mechanically C. Hydraulically D. Electrically...