A. removal of bottom portion
B. excavation of one drift in the centre
C. removal of top portion
D. excavation being done along the periphery
Related Mcqs:
- The most suitable soil for compressed air tunneling is________________?
- A. silt B. sand C. clay D. gravel...
- Which of the following methods of tunneling is used for long tunnels at great depths ?
- A. Army method B. Needle beam method C. Austrian method D. English method...
- What is the correct sequence of the following events in rock tunnelling?
- 1. marking tunnel profile 2. loading explosives and blasting 3. checking misfire 4. mucking 5. removing foul gas 6. setting up and drilling 7. guniting Select the correct answer using the codes given below Codes ? A. 1,6,5,3,4,2,7 B. 1,2,6,3,5,4,7 C. 1, 6,2, 5,4, 3, 7 D. 1,6,2,5,3,4,7...
- What is the correct sequence of the following events of construction of a shaft in rock ?
- 1. drilling and blasting 2. timbering 3. pumping 4. mucking Select the correct answer using the codes given below Codes? A. 1,2,3,4 B. 1,4,2,3 C. 2,1,4,3 D. 2,4,1,3...
- Assertion A : English method of tunneling requires more time as compared to other methods of tunneling. Reason R : In English method of tunneling, the masons and excavators have to work alternately/
- A. Both A and R are true and R is the correct explanation of A. B. Both A and R are true and R is not the correct explanation of A. C. A is true but R is false. D. A is false but R is true....