A. is less.accurate than height of instrument method
B. is not suitable for levelling with tilting levels
C. provides a check on the reduction of intermediate point levels
D. quicker and less tedious for large number of intermediate sights
Related Mcqs:
- The permissible error in chaining for measurement with chain on rough or hilly ground is_____________?
- A. 1 in 100 B. 1 in 250 C. 1 in 500 D. 1 in 1000...
- A telescope is said to be inverted if its______________?
- A. vertical circle is to its right and the bubble of the telescope is down B. vertical circle is to its right and the bubble of the telescope is up C. vertical circle is to its left and the bubble of the telescope is down D. vertical circle is to its left and the bubble … A telescope is said to be inverted if its______________?Read More...
- As applied to staff readings, the corrections for curvature and refraction are respectively The above table shows a part of a level field book. The value of X should be________________?
- A. 98.70 B. 100.00 C. 102.30 D. 103.30...
- The difference of levels between two stations A and B is to be determined. For best results, the instrument station should be_______________?
- A. equidistant from A and B B. closer to the higher station C. closer to the lower station D. as far as possible from the line AB...
Recent Comments