Search
.Management Sciences
A. increase
B. decrease
C. not change
D. either ‘a’ or ‘b’
Related Mcqs:
- Which of the following methods of offsets involves less measurement on the ground?
- A. method of perpendicular offsets B. method of oblique offsets C. method of ties D. all involve equal measurement on the ground...
- For a line AB_______________?
- A. the forebearing of AB and back bearing of AB differ by 180° B. the forebearing of AB and back bearing of BA differ by 180° C. both (A. and (B. are correct. D. none is correct...
- If the lower clamp screw is tightened and upper clamp screw is loosened, the theodolite may be rotated____________?
- A. on its outer spindle with a relative motion between the vernier and graduated scale of lower plate B. on its outer spindle without a relative motion between the vernier and gra-duated scale of lower plate C. on its inner spindle with a relative motion between the vernier and the graduated scale of lower plate … If the lower clamp screw is tightened and upper clamp screw is loosened, the theodolite may be rotated____________?Read More...
- A series of closely spaced contour lines represents a___________________?
- A. steep slope B. gentle slope C. uniform slope D. plane surface...
- After fixing the plane table to the tripod, the main operations which are needed at each plane table station are ______________ ?
- 1. levelling 2. orientation 3. centering The correct sequence of these operations is A. (1), (2),(3) B. (1), (3), (2) C. (3), (1), (2) D. (2), (3), (1)...
Recent Comments