Search
.Management Sciences
A. require slope correction
B. require tension correction
C. require slope and tension corrections
D. do not require slope and tension corrections
Related Mcqs:
- Which of the following methods of offsets involves less measurement on the ground?
- A. method of perpendicular offsets B. method of oblique offsets C. method of ties D. all involve equal measurement on the ground...
- The horizontal angle between the true meridian and magnetic meridian at a place is called______________?
- A. azimuth B. declination C. local attraction D. magnetic bearing...
- If a tripod settles in the interval that elapses between taking a back sight reading and the following foresight reading, then the elevation of turning point will_________________?
- A. increase B. decrease C. not change D. either ‘a’ or ‘b’...
- If altitude bubble is provided both on index frame as well as on telescope of a theodolite, then the instrument is levelled with reference to_________________?
- 1. altitude bubble on index frame 2. altitude bubble on index frame if it is to be used as a level 3. altitude bubble on telescope 4. altitude bubble on telescope if it is to be used as a level The correct answer is? A. only (1) B. both (1) and (4) C. only (3) … If altitude bubble is provided both on index frame as well as on telescope of a theodolite, then the instrument is levelled with reference...
- Direct method of contouring is_________________?
- A. a quick method B. adopted for large surveys only C. most accurate method D. suitable for hilly terrains...
Recent Comments